Purchase Order Requirements
All information must be filled out completely to avoid delays.
1. PO #
2. Part #
3. Raw Material condition – i.e. 2024-T3
4. Drawing revision level
5. Must supply a print or sketch
6. Processing specification/instructions with the latest revision level – i.e. Chromic Acid Anodize Type 1 per MIL-A-8625 Rev F
7. NDT Processing specifications/instruction also require NDT method, inspection criteria & product level of sensitivity to be used – i.e. Fluorescent Penetrant Inspect Type I method A sensitivity level 3 per BAC5423 (inspection criteria) & BSS 7039 (method), other example; FPI per ASTM E1417, type 1 method A, level 3, inspect per MIL-STD-1907. Note all specification must have latest revision level on PO
8. Any special instruction that may be applicable to these parts – i.e. special packaging requirements
9. Quote value – i.e. the min lot charges or the per piece price